article thumbnail

Kimberly-Clark Announces First Tissue Manufacturing Site on Path to 100% Renewable Energy

3BL Media

Kimberly-Clarks tissue manufacturing site in Koblenz, Germany is on track to move to 100% renewable energy by 2029. The transition is intended to be completed by 2029 latest. K-C discloses its scope 2 emissions using both location and market-based methods as directed by the Greenhouse Gas Protocol. [3]